
4G Energy System
Nissan - NMMUK Sunderland
Industry
Industrial Energy Communications
Solution
4G Industrial Communication System
Use
Real-Time Power System Monitoring
Background
NMMUK Sunderland required reliable communication between main high-voltage (HV) panels and remote solar farm panels. Previous attempts by other providers had failed due to the challenges of the site's scale and the need for uninterrupted data flow. Traditional cabling solutions were impractical, requiring extensive trenching and disruption to existing infrastructure. Juggle Energy was brought in to solve this problem with a robust, wireless-first approach.
Solution
Leveraging our advanced networking and Modbus expertise, we designed and deployed a cutting-edge solution .
LoRa Mesh Failover
Conclusion
Juggle Energy successfully delivered communication infrastructure with our wireless-first, intelligent failover approach. Also provided a cost-effective alternative to traditional cabling, while maximising system availability.
Contact
Us
Support
support@juggle.energy
03330905377
07483 394356
Our Address
1A Cooper Drive
Braintree
CM7 2RF
Product - Sales Enquires
sales@juggle.energy
